Design and Access Statement: Requirements, Contents and When You Need One

A Design and Access Statement is a supporting document that explains the design principles behind a proposed development…

A Design and Access Statement is a supporting document that explains the design principles behind a proposed development…

A planning statement explains why a proposed development should be granted planning permission. It sets out the details…

A planning statement is a supporting document that explains a proposed development and sets out why it should…

Planning application drawings are a key part of submitting a planning application in England. They provide the local…

The planning application process is the formal process used to apply for planning permission and have a proposed…

Planning permission drawings are an important part of a planning application. They show the local planning authority what…

The planning permission process is the series of steps involved in establishing whether a development requires planning permission,…

A planning application in England usually takes 8 weeks to receive a decision once it has been validated.…

In England, most standard planning applications have a statutory determination period of 8 weeks. Applications for major development…

The planning consultant hourly rate can vary considerably depending on the consultant’s experience, location, specialism and the complexity…